update from sparkleup
This commit is contained in:
parent
8171253437
commit
0e970fcede
|
@ -146,6 +146,7 @@ Digital signatures:
|
|||
* Green:
|
||||
* *Launch arm integrity:* 100% (go)
|
||||
* *Launch arm path:* Clear (go)
|
||||
* *Launch arm cameras:* 100% (go)
|
||||
* *Launch vehicle path:* Clear to transsolar 1.8AU, 5 nines confidence (go)
|
||||
* *Helical railgun:* Tests pass (go)
|
||||
* *Capacitor charge:* 6 nines, on track to 100% (go)
|
||||
|
@ -155,6 +156,7 @@ Digital signatures:
|
|||
* Blue:
|
||||
* *Launch arm integrity:* 100% (go)
|
||||
* *Launch arm path:* Clear (go)
|
||||
* *Launch arm cameras:* 100% (go)
|
||||
* *Launch vehicle path:* Clear to cissolar 1.2AU, 5 nines confidence (go)
|
||||
* *Helical railgun:* Tests pass (go)
|
||||
* *Capacitor charge:* 6 nines, on track to 100% (go)
|
||||
|
@ -205,3 +207,7 @@ Digital signatures:
|
|||
*Notes:* We are 1% away from desired power consumption reduction on the station. While this is within tolerances, we are expecting that, with the shutdown of the glass furnace at 2330, we will hit our mark of 15% station-wide power reduction. Congratulations!
|
||||
|
||||
-----
|
||||
|
||||
## Message stream
|
||||
|
||||
**Sys-side:** The launch vehicles in their sabots are settled into their creches and the doors are shut. Everyone's excited, but I'm pleased at the calm efficiency of the control tower I'm in (Blue). We are 1 degree offset spinward from the launch arm, so we should be able to see the start of the launch well enough.
|
||||
|
|
Loading…
Reference in New Issue